A year and a half in the making, the new studio is finally complete.
The summer of 2003 saw the renovation of the first floor of the Drake University Olmsted Center into the Pomerantz Student Union. With this renovation, KDCS was given a small room in which to build a studio. After fundraising and approaching student senate for a few extra bucks, construction began. On January 18, 2005, the new studio went online. Below is a photo tour of the project. The KDCS History page will give you a full history of how the new studio developed.


The studio when classes resumed in the fall of 2003.


In October 2004, destruction began in order to make way for the new gear.


Masking tape marked the intended position of the desk.


A look "underneath the hood."


The men behind the studio.

 


The original studio configuration. This was always meant to be a temporary studio (hence the crazy wires). Using a live sound mixing board as the console, the studio opened for student use in March 2004.


Scott and Carl demolishing the studio.


The initial setup of the computer monitors.


It took nearly every piece of Scott and Carl's tool sets to complete the installation of the studio.


The finished studio, January 18, 2005.

Back to top

© 2005 Drake Broadcasting System
9 Meredith Hall | Drake University | Des Moines, IA 50311
Ph. 515-271-2766 |
Fax 515-271-2798
Site Designed by Carl Sundermann
Site Maintained by Morgan Brigman
Home | About Us